Cawood Bridge Repairs – Delays Possible

Work on strengthening Cawood Bridge means that there are likely to be delays going through Cawood from the 9th June to the 2nd September. From 9th June, a layby will be closed and parking suspended on Old Road to allow parking of contractors vehicles. Then from 24th July the bridge will be closed and will reopen in time for the Cycling Sportif on 3rd September.
The Road Closure and any associated Diversion Routes can be viewed using this URL link https://roadworks.org?tm=154127